All news

Mexico

IFT open public consultation on 6GHz band in Mexico

Mexico Flag

09-NOV-20

On 6th November 2020, IFT opened a public consultation on the use of the 6GHz band in Mexico.

IFT is looking to gather information, opinions, and proposals on the future use of the 5925–7125MHz frequency band (known as the 6 GHz band), considering the latest technological advances and services already operating in the 6GHz band in Mexico.

Alongside the consultation document, IFT included a reference document with information on the current and anticipated uses of the 6GHz band in various countries worldwide. This document includes details regarding global implementation of new technologies using all of or part of the 6GHz band, such as Wi-Fi 6, 5G NR-U and those relating to IMT (international Mobile Telecommunications).

The public consultation will be open until 18th December 2020 and once closed, IFT will review all comments and then determine the different uses that may be given to the 5925-7125MHz band in Mexico. A decision is expected to be published soon after the closure of the public consultation.

Interested parties can submit comments by e-mail to planeacion.espectro@ift.org.mx, or by post to the following address: Oficina de Partes Común del Instituto Located in Insurgentes Sur 1143, Colonia Nochebuena, Demarcación Territorial Benito Juárez, C.P. 03720, México City.

For a copy of the public consultation document, please get in touch.


Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Philippines
Philippines flag

Philippines NTC to Implement 4-Day Workweek

The Philippines National Telecommunications Commission (NTC) is transitioning to a compressed workweek, which may impact type approval timelines for radio device manufacturers.

14-APR-26 Read more
Abstract background for news article
Eswatini
Eswatini flag

Eswatini Issues Updated Fixed Terrestrial Services Band Plan 2026

The Eswatini Communications Commission (ESCCOM) has released an updated Fixed Terrestrial Services Band Plan to align with international WRC-23 standards and regional SADC frameworks.

14-APR-26 Read more
Abstract background for news article
Eswatini
Eswatini flag

Eswatini to Enforce Stricter Type Approval and Import Controls

Manufacturers and importers must prepare for enhanced enforcement of Type Approval regulations in Eswatini starting April 2026.

14-APR-26 Read more