All news

Nepal

Nepal Extends Deadline for 800 MHz Spectrum Auction

Nepal Flag

13-OCT-26

The Nepal Telecommunications Authority (NTA) has issued a re-notice regarding the auction of residual radio frequency spectrum in the 800 MHz band. In an update published on 09 October 2026, the NTA confirmed an extension to the application process.

Key Details for Applicants:
  • The deadline for the submission of the Pre-Qualification Bid has been extended by 15 calendar days from 09 October 2026.
  • All existing eligibility criteria, terms, and conditions outlined in the original Bid Document remain in effect.
  • This process is being conducted under the Telecommunication Regulations, 2054, and the Radio Frequency (Allocation and Pricing) Policy for Telecommunication Services, 2080.

This extension provides additional time for stakeholders to prepare their submissions for this competitive bidding process. Manufacturers and operators should ensure their documentation aligns with the updated timeline to maintain compliance with NTA requirements.


For further analysis on how this auction impacts your market entry and product deployment timelines in Nepal, please contact Eleos Compliance for a detailed consultation.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Canada
Canada flag

Canada ISED Publishes RSS-193 Issue 2 for Flexible Use Broadband Equipment

ISED has released RSS-193 Issue 2, updating the certification requirements for flexible use broadband equipment operating in the 24.25–28.35 GHz and 37.6–40.0 GHz frequency bands.

04-NOV-26 Read more
Abstract background for news article
Canada
Canada flag

Canada ISED Updates Technical Requirements for Fixed Radio Systems in the 10.7–11.7 GHz Band

Canada has issued SRSP-310.7 (Issue 5, October 2026), outlining updated technical requirements for fixed point-to-point radio systems operating in the 10.7–11.7 GHz band, including frequency arrangements, transmitter power limits, spectral efficiency and antenna requirements.

04-NOV-26 Read more
Abstract background for news article
India
India flag

India Introduces New Framework for Mandatory Product Compliance

The Ministry of Commerce and Industry has notified the Transition Facilitation (Quality Control) Order, 2026, introducing a new BIS certification route for manufacturers supplying companies approved by DPIIT. The Order covers 10 existing Quality Control Orders and sets out eligibility, assessment and compliance requirements.

04-NOV-26 Read more