All news

Brazil

New Regulations

Brazil Flag

02-NOV-19

Brazilian Regulator ANATEL have issued a new resolution – Resolução No. 715, de 23 de Outubro de 2019 which will, on 22nd April 2020 revoke Resolution No. 242 of November 30, 2000 and Resolution No. 323, of November 7, 2002.

Key changes introduced by the new resolution are as follows:

  1. ANATEL will no longer charge a fee for approval of telecommunications products.
  2. In the case of products requiring re-testing at time of approval renewal, samples will be taken from the local market rather than submitted by the manufacturer.
  3. Market surveillance measures will be introduced.

The Operational Procedures to support the new Resolution are yet to be published however will also present changes to the current procedure. More details to follow.

In the meantime, the link to the new resolution can be found here.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Ghana
Ghana flag

Ghana NCA Public Consultation on Wi-Fi 6 Lower Band Use Services

Ghana’s National Communications Authority (NCA) has opened a public consultation on a proposal to authorize the use of the Lower 6 GHz (L6GHz) band (5925–6425 MHz) for Wi-Fi 6 (Wi-Fi 6E) services. The consultation seeks stakeholder input on technical, operational, and regulatory conditions ahead of a planned license-exempt framework for wireless access systems.

16-JAN-26 Read more
Abstract background for news article
Pakistan
Pakistan flag

Pakistan Updated Framework for SRD and Terrestrial IoT Services (V1.4)

On 18 December 2025, PTA of Pakistan released Version 1.4 of the Regulatory Framework for Short-Range Devices (SRD) and Terrestrial Internet of Things (IoT) Services. The update refines technical, operational, and compliance requirements to support the continued deployment of SRD and IoT technologies while ensuring efficient spectrum use and regulatory alignment.

16-JAN-26 Read more
Abstract background for news article
Cayman Islands
Cayman Islands flag

OfReg publishes updated regulatory notice on ICT licensing and SRD use

The Utility Regulation and Competition Office (OfReg) of the Cayman Islands published a Regulatory Notice in December 2025 clarifying the types of Information and Communications Technology (ICT) networks and services that require licensing under the Information and Communications Technology Act (2019 Revision).

14-JAN-26 Read more