All news

Singapore

IMDA is seeking views on the proposed VoLTE requirements for Mobile Terminals

Singapore Flag

22-JAN-24

On 27 July 2023 IMDA announced that 3G services would cease on 31 July 2024. Please take note of the following timelines of the upcoming changes to 3G networks and services in Singapore:
  • From 1 November 2023: The Infocomm Media Development Authority (IMDA) has stopped accepting new registrations and renewals of 3G-only mobile phones and non-VoLTE capable smartphones.
  • From 1 February 2024: The sale of 3G-only mobile phones and non-VoLTE capable smartphones for local use will no longer be allowed.  IMDA will invalidate the registrations of these equipment by 1 February 2024.
  • From 31 July 2024 onwards: 3G networks and services will cease in Singapore. 

To better serve the interest of consumers in Singapore, IMDA is proposing that dealers who are importing mobile phones for sale in Singapore will need to ensure that the mobile phones they are selling comply with the following requirements:
  • Mobile phones shall be capable of making VoLTE calls on all four Mobile Network Operators’ (“MNOs”) public networks in Singapore. Dealers shall validate this through their own testing and submit a declaration letter as a form of confirmation to the requirement during the equipment registration process.
  • Mobile phones shall comply with the specifications in 3GPP TS34.229-1. If unsure, dealers/equipment suppliers shall check with their handset manufacturers on compliance to the specifications and submit a compliance checklist during the equipment registration process.

Comments should reach IMDA by 31st January 2024 via email to Telecoms_Standards@imda.gov.sg. 
 
For more information, please get in touch.


Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Nigeria
Nigeria flag

Nigeria NCC Notice on Type Approval Compliance for SIM-Enabled Devices

The Nigerian Communications Commission is intensifying enforcement of type approval and IMEI verification requirements for all SIM-enabled devices.

23-OCT-26 Read more
Abstract background for news article
Canada
Canada flag

Canada ISED Consults on SRSP-522 for 24 & 28 GHz Bands

Innovation, Science and Economic Development Canada (ISED) is seeking comments on SRSP-522, Issue 2, which proposes updated technical requirements for non-competitive local licensed fixed, mobile, and flexible-use broadband systems in the 24.25–25.1 GHz and 27.5–28.35 GHz bands. The consultation introduces technical rules for the 24.25–25.1 GHz band. Comments are due by 15 January 2027.

21-OCT-26 Read more
Abstract background for news article
Japan
Japan flag

MIC Draft Frequency Reorganization Action Plan

Japanese Ministry of Internal Affairs and Communications (MIC) in Japan has opened the following public consultation for the Frequency Reorganization Action Plan (FY2026 edition)

16-OCT-26 Read more