All news

Brazil

ANATEL open public consultation No. 47

Brazil Flag

23-SEP-21

The Brazilian Regulator, ANATEL, has opened Public Consultation No. 47, from 08 September through to 07 November 2021, with the view to update the Technical Requirements and Test Procedures for Assessing the Conformity of Chargers Used in Cell Phones (currently Act 3481).

Scope:

a) chargers whose power source is the electric power network with alternating current (AC).
b) special purpose USB interfaces (ports) for powering electronic devices, without data transmission functionality.
c) inductive chargers, regardless of the type of electrical power source.

USB interfaces that integrate the electrical/electronic design of a device (eg TV, computer, media centre, etc.) are not covered by these requirements.

The public consultation can be found via the link here.

If you have any questions, please get in touch.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Ghana
Ghana flag

Ghana NCA Public Consultation on Wi-Fi 6 Lower Band Use Services

Ghana’s National Communications Authority (NCA) has opened a public consultation on a proposal to authorize the use of the Lower 6 GHz (L6GHz) band (5925–6425 MHz) for Wi-Fi 6 (Wi-Fi 6E) services. The consultation seeks stakeholder input on technical, operational, and regulatory conditions ahead of a planned license-exempt framework for wireless access systems.

16-JAN-26 Read more
Abstract background for news article
Pakistan
Pakistan flag

Pakistan Updated Framework for SRD and Terrestrial IoT Services (V1.4)

On 18 December 2025, PTA of Pakistan released Version 1.4 of the Regulatory Framework for Short-Range Devices (SRD) and Terrestrial Internet of Things (IoT) Services. The update refines technical, operational, and compliance requirements to support the continued deployment of SRD and IoT technologies while ensuring efficient spectrum use and regulatory alignment.

16-JAN-26 Read more
Abstract background for news article
Cayman Islands
Cayman Islands flag

OfReg publishes updated regulatory notice on ICT licensing and SRD use

The Utility Regulation and Competition Office (OfReg) of the Cayman Islands published a Regulatory Notice in December 2025 clarifying the types of Information and Communications Technology (ICT) networks and services that require licensing under the Information and Communications Technology Act (2019 Revision).

14-JAN-26 Read more