All news

Indonesia

Foreign test reports issued after 1 Jan 2025 cannot be used for SDPPI certification

Indonesia Flag

09-JAN-25

The Indonesian KOMINFO (Ministry of Communications and Informatics) has announced that the period of validity of the SDPPI Director General Decree Number 109 of 2024 regarding the Determination of Foreign Test Centres for the purpose of Certification of Telecommunications Equipment and/or Telecommunications Devices has ended on 31 December 2024.

In this connection, the following should be taken into account:

1. that Test Reports issued as of 1 January 2025 by SDPPI accredited foreign test centres cannot currently be used for the certification process. This will apply until a new decree regulating them is issued. 

2. That Test Reports issued before 1 January 2025 by SDPPI accredited foreign test centres have a transition period in the PM KOMINFO (Regulation of the Minister of Communication and Informatics) Number 5 of 2024, which defines that they can still be used for the certification process for the next 6 months, starting from 1 January 2025. After this grace period -1 July 2025-, these cannot be used for certification processes either, until a new decree regulating them is issued.

For further information or questions about the information provided in this article, please do not hesitate to contact us.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Ghana
Ghana flag

Ghana NCA Public Consultation on Wi-Fi 6 Lower Band Use Services

Ghana’s National Communications Authority (NCA) has opened a public consultation on a proposal to authorize the use of the Lower 6 GHz (L6GHz) band (5925–6425 MHz) for Wi-Fi 6 (Wi-Fi 6E) services. The consultation seeks stakeholder input on technical, operational, and regulatory conditions ahead of a planned license-exempt framework for wireless access systems.

16-JAN-26 Read more
Abstract background for news article
Pakistan
Pakistan flag

Pakistan Updated Framework for SRD and Terrestrial IoT Services (V1.4)

On 18 December 2025, PTA of Pakistan released Version 1.4 of the Regulatory Framework for Short-Range Devices (SRD) and Terrestrial Internet of Things (IoT) Services. The update refines technical, operational, and compliance requirements to support the continued deployment of SRD and IoT technologies while ensuring efficient spectrum use and regulatory alignment.

16-JAN-26 Read more
Abstract background for news article
Cayman Islands
Cayman Islands flag

OfReg publishes updated regulatory notice on ICT licensing and SRD use

The Utility Regulation and Competition Office (OfReg) of the Cayman Islands published a Regulatory Notice in December 2025 clarifying the types of Information and Communications Technology (ICT) networks and services that require licensing under the Information and Communications Technology Act (2019 Revision).

14-JAN-26 Read more